Understanding the technique
Measures electrochemical protection conditions on submerged metallic structures. CP observations are integrated with visual condition information and other relevant inspection findings.
Where it adds value
Subsea structures and marine assets protected against corrosion.
The purpose is to provide evidence that supports a defined asset decision: prioritizing maintenance, investigating degradation, assessing serviceability or documenting equipment condition. The examination is planned around the asset's operating context and the information needed by the owner.
Inspection outputs
Recorded potentials, inspected locations and observations on protection-system condition.
Planning considerations
Reliable reference measurements and suitable access are required. Acceptance criteria are established for the specific structure and environment.
From scope to decision
Provide equipment identification, drawings, material details, operating conditions and previous inspection records where available.
Confirm the inspection objective, accessible locations, coverage, acceptance basis, site arrangements and reporting requirements.
Review recorded findings against the agreed scope, identify any coverage limitations and define the need for further inspection or engineering assessment.
Project questions
What information helps define a quotation?
Share the asset type, location, quantity, inspection objective and desired schedule. Drawings, previous reports and access information help the team prepare a realistic scope.
Can this technique be combined with other services?
Yes. Complementary examination or engineering assessment may be needed to characterize relevant findings. The combination depends on damage mechanisms, material, geometry and the decision required.